Aerial 26-1 / GH200 / TV79 64T64R, 6 cells: configuration review for DLC timing errors

Hi @nhashimoto,

Aerial 26-1: How to Measure cuPHY/L1 Processing Latency with TestMAC 59c - Accelerated Computing / Aerial Forum - NVIDIA Developer Forums

Thank you for your help with the 20C / 59c test. That issue has been resolved, and we have now moved on to testing 6C / 79, where we are encountering DLC timing errors.

TV79_6C_NVIDIA_forum_20261015T035834Z_concise.zip (27.5 KB)

We configured the main test parameters and CPU assignments using the official Aerial 26-1 setup/test_config flow. Our local platform adaptation is described below.

Could you please review our configuration, confirm whether any required settings or prerequisites are missing, and help diagnose the timing errors in the TestMAC → L2 adapter → cuPHYController → FH transmit path?

Environment:

  • DU/TestMAC: QCT S7G, GH200/Grace, ConnectX-7.
  • RU Emulator: S7E, Xeon 6781P/x86, ConnectX-7.
  • SDK/container: 26-1-cubb; NVIDIA source commit efe0d8c73e3ecc83a36ccdfec631d8f34a2e980f (verified tag 26.1.2).

DU, TestMAC, RU Emulator and their Aerial libraries were independently built from clean official executable source, without measurement, optimization or functional patches. Source checks distinguish normal generated YAML changes from executable-source changes. Same-run binary/library paths and SHA256 match those clean builds.

Workload/profile: 79, 64T64R, 6 cells, CG1_CG1, with:

79 --num-cells=6 --num-ports=1 --num-slots=600000 --compression=1 --BFP=9 --ehq=1 --green-ctx=0 --work-cancel=2 --pmu=0 --STT=480000

We used the unchanged official run1_RU → run2_cuPHYcontroller → run3_testMAC wrappers and normal MPS procedure. Logging came from clean official templates through normal test_config; no extra debug or --log-nic-timings was added. Actual DL workers used individual CPUs 9–16/FIFO95; timer/message used CPU17/FIFO99 and FIFO95, matching the selected logical profile. The attachment includes the other CPU and timing settings.

Local adaptation: a separately saved S7E setup2 host-type guard allows the requested CG1 profile for this single-NUMA x86 host, normally detected as DEVKIT. The official compiled source and original setup script remain unchanged. Its exact conditions and configuration differences are included; please confirm whether this platform adaptation requires additional settings.

On 2026-10-15, formal traffic ran from 03:37:24.280027 to 03:42:24.280021 UTC. All six cells completed 600,000 slots, but 39,416 runtime DLC timing errors occurred: Cell0=30,000; Cell1=9,416; Cells2–5=0. All DLC errors have matching msg_id=0x83 / err_code=0x36 Err.ind records.

The first DLC was Cell1/SFN1.0 at 03:37:24.289364265 UTC: start_tx_time/deadline=1792035444289331000 ns, current_time=1792035444289364265 ns, threshold=0, late=33.265 us. The excerpts include first, middle and final errors and six-cell completion. An earlier separate ULC0x37 event is identified separately; startup/post-stop diagnostics are not counted as runtime DLC. Completion is not a timing/functional pass.

Per-message TestMAC FAPI-send and DU receive/scheduling times for the failed message remain unknown. The late C-plane check alone does not establish that TestMAC sent FAPI late.

Could you please confirm:

  1. Whether our TestMAC/L2 adapter/controller settings, FAPI/slot advance, FH timing, CPU mapping/priorities and logging match your GH200 TV79/64T64R/6-cell validation conditions.
  2. Whether any prerequisite, startup step, version pairing or known fix is missing, including for the declared S7E adaptation.
  3. If the configuration is correct, which timestamps or measurement points you recommend next.

We have attached concise excerpts of the configuration, build and execution evidence, and logs. The complete files are preserved and can be provided upon request.

Thank you.

Best regards,
August

Hi August,

With 6-peak mMIMO cells and a 200G FH link, the modulation compression is mandatory instead of BFP9 because the required fronthaul bandwidth in DL exceeds the wire rate. So, please use F08_6C_79_MODCOMP_STT480000_EH_1P test case string.

Thank you.

Hi @nhashimoto,

Thank you for your guidance. We switched to F08_6C_79_MODCOMP_STT480000_EH_1P and reran the test using the same clean official binaries.

All six cells completed 600,000 slots, with:

Zero DLC timing errors and zero Err.ind records.

100% RU DL C-plane and DL U-plane packet/slot on-time, with zero early or late counts across all six cells.

GOOD=TOT and BAD=0 for all seven RU validation categories.

Both DU and RU used DL comp_meth=4, bit_width=9. The previously reported issue was not reproduced in this run.

One follow-up question: for this 6-cell peak mMIMO test over a 200G FH link, should UL remain configured as BFP9 (comp_meth=1, bit_width=9), as generated by the official scripts, or should UL also use modulation compression (comp_meth=4)?

Concise configuration and log excerpts are attached; complete files are available upon request.

Thank you again for your help.

Best regards,
August

The modulation compression is not applicable for UL because it utilizes the IQ constellation of the QAM modulation, and the IQ constellation in UL is distorted by the wireless channel. It is a compression method only for non-precoded DL signals.

Thank you.

Hi @nhashimoto,

Thank you for your quick responses and clear explanations. Your guidance helped us resolve the issue and gain a much better understanding of fronthaul compression and its use in DL and UL.

We’ve learned a lot from this discussion and really appreciate your support.

Best regards,
August