Discharge Timing Requirements

What are the discharge timing requirements? How were the values derived on the reference carrier? I didn’t see this in the documentation - if I missed it, please point me to the doc/section.

Hi, discharging is needed for power down sequence as described in OEM DG. It is rough timing as power down sequence figure showing, all customer need to do is to follow the design of discharging part.

Thanks!