MQM9790 with splitter cable and rail pairing selection

As mentioned in the article, each scale unit (SU) contains four leaf switches per plane, with each leaf supporting two rails in the following combinations: 1+5, 2+6, 3+7, and 4+8.

I would like to understand why the pairing is not arranged as 1+2, 3+4, 5+6, and 7+8 instead. Is the 1+5, 2+6, 3+7, 4+8 configuration considered a better design? If so, what is the reasoning behind it?

Additionally, assuming that each GPU in the compute cluster is equipped with 8 ConnectX-6 interfaces, and using the MQM9790 switch with MFA7U10 OSFP-to-2x QSFP56 active optical splitter cables (AOC) — which convert 400 Gb/s into 2 × 200 Gb/s — would the leaf layer still require 4 switches per SU? And should the same rail pairing scheme (1+5, 2+6, 3+7, 4+8) be applied to each leaf?

Thank you for your time and clarification.

Hi,

The page you mentioned is for Ethernet fabric.

You can refer bellow for IB:

Thanks,

Suo