Hi NVIDIA Aerial team,
Thank you for releasing Aerial Testbed 1.0 and the updated installation documentation.
I am preparing to build an Aerial Testbed setup using the following hardware listed in the documentation:
- DGX Spark
- Dell PowerSwitch S5248F-ON as the fronthaul switch
- VIAVI Qg 2 Multi-Sync Gateway and PTP GrandMaster
- WNC 1220 O-RU, 4T4R
I would like to confirm the recommended physical cabling for this specific setup.
Based on the current documentation, the Dell S5248F-ON example mentions the following port usage:
- RUs on ports 1 and 7
- GrandMaster on port 5
- CN on ports 11 and 12
- gNB ports on ports 49 and 51
Could you please clarify the actual physical cabling for a DGX Spark-based setup?
Physical topology diagram or real setup photos, Would it be possible to provide either:
- A physical cabling diagram for the DGX Spark + Dell S5248F-ON + VIAVI Qg 2 + WNC 1220 setup, or
- Real lab photos showing the actual cable connections between DGX Spark, the Dell fronthaul switch, the VIAVI Qg 2, and the WNC 1220 O-RU?
This would be very helpful for reproducing the Aerial Testbed 1.0 deployment, especially for users who are setting up the hardware for the first time.
Thanks.