Wait time required between system power cycles
After powering off the NVIDIA DRIVE AGX System, NVIDIA recommends waiting for more than 20 seconds before powering on the system to allow all voltage rails to drain below the 100mV threshold.
Power sequencing required to prevent backdrive from HDMI monitors
Use the following required power sequencing when using an HDMI monitor:
- Power on the NVIDIA DRIVE AGX System first, then power on the HDMI monitor
- Power off the HDMI monitor first, then power off the NVIDIA DRIVE AGX System
Please see here for additional information:
https://developer.nvidia.com/DRIVE/secure/docs/DE-08933-001_v07.pdf