Hi,
The power-up sequence is described in [Figure 5-3. Power Up Sequence]
(Jetson_Nano_Product_Design_Guide_DG-09502-001_v2.2.pdf),
but the time is not specified. If there is a specified value, please let me know.
Are there any restrictions on the timing of the PMIC_BBAT input?
Best Regards,
UNA